Still 90%

Worked really hard this week:



  • Fabricated electronics for and checked out Main Valve assembly.

  • Fabricated all of and tested 1/2 of the main system electronics.

  • Fabricated Electronics box.

  • Wired top end of the vehicle.

  • Assembled 100% of the plumbing.

One more long day and the silver vehicle /regen motor will be ready for a static test.


We had hoped to test this weekend, alas its not going to be. We still have to drive out to FAR on Sunday as we have committed to a customer test(Can’t talk about)  and we have a U-haul trailer attached to the truck with 1250 pounds of compressor and air drying equipment. I’ll try to show some pictures in the next few days.


 


 


 


 


 


 


 