The whole assembly is upside down.
From Top of picture to bottom…. Motor (not yet welded together) Big stainless check valve, main valve, tank(100% welded) plastic bucket. We will provide some pictures of the tanks in process as our welder Bob took some pictures, but I don’t have them yet.
Detail shot of the gear mount. (Upside down)
Detail shot of the Tank Top…
So far the tank is about 5% over the “Spread sheet” target weight and the motor is 50% under the spread sheet SWAG, In total all parts we can weigh are comming in under the target weight.
The motor exit cone needs to be shortened a bit and the main chamber will shrink as we have a really parinoid L*. We are missing one small fitting for the Catalyist injector fittings or the whole motor would get welded together today. The local indusrtial hardware store is usually open on Saturday, but they closed for Easter.
Tidak ada komentar:
Posting Komentar